国内精品视频一区二区三区八戒,亚洲一区色图,91专区,yellow网站在线观看

SHENZHOU MANUFACTURING GROUP

+86-315-2961888/+86-315-2965555

Baiyinhua No. 3 coal mine dry coal preparation plant, with a design capacity of 6.0mt/a, is built in an open pit, and it takes only 70 days from construction to operation. It is mainly used for the full size separation of residual coal and low calorific value coal in the pit. The calorific value of raw coal is 2958kcal / kg, and the calorific value of cleaned coal after separation is increased to 3524kcal / kg. Dry separation not only improves the calorific value of coal, but also reduces the stock of residual coal and reduces the risk of spontaneous combustion, which has brought huge economic and social benefits to the mine. It is also the largest underground dry coal preparation plant in the world.


ITEM

yield Wt%

ASH Ad% ??

Qnet,ar,Kcal/kg ? NET CALORIFIC VALUE Qnet,ar,Kcal/kg ??

RAW COAL

100

31.55

2937

CLEAN COAL

80.40

18.99

3524

REJECT

19.60

83.08

531


INNER MONGOLIA BAIYINHUA MENGDONG OPEN PIT COAL INDUSTRY CO., LTD

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE

盐城市| 时尚| 岳池县| 大兴区| 雷山县| 秦安县| 察雅县| 浙江省| 罗山县| 纳雍县| 华池县| 盘山县| 钟祥市| 罗山县| 忻州市| 乌拉特后旗| 庆城县| 百色市| 安宁市| 南江县| 诸城市| 浦江县| 米泉市| 田林县| 长海县| 牟定县| 蒙阴县| 石家庄市| 东乡| 旬邑县| 惠水县| 和顺县| 梁平县| 阿拉善盟| 报价| 筠连县| 高淳县| 平湖市| 扶绥县| 印江| 政和县|