国内精品视频一区二区三区八戒,亚洲一区色图,91专区,yellow网站在线观看

SHENZHOU MANUFACTURING GROUP

+86-315-2961888/+86-315-2965555

Located in wedbank coalfield, South Africa, Kral coal mine invested in the construction of a 3.0mt/a dry coal preparation plant in 2010 to separate No. 2 thermal coal. The ash content of raw coal is 40.4%, the ash content of cleaned coal after beneficiation is 30.6%, and the recovery rate is 85%. It is mainly sold to power plants. The dry separation plant has an hourly processing capacity of 500 tons and an annual operation of 6000 hours. It has the advantages of short investment payback period, low operation cost and high recovery rate.

KRAL COAL MINE

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE

柯坪县| 乡城县| 自贡市| 青田县| 平乐县| 屏边| 固安县| 花莲县| 阳谷县| 师宗县| 金沙县| 时尚| 洪湖市| 兴文县| 岫岩| 林周县| 宣汉县| 琼海市| 泸溪县| 古田县| 石嘴山市| 闻喜县| 河曲县| 平利县| 桃江县| 额尔古纳市| 凤庆县| 都昌县| 咸丰县| 肃北| 西平县| 壶关县| 宁阳县| 遂溪县| 黔南| 宁化县| 玉林市| 黄平县| 霍城县| 吴忠市| 岢岚县|