国内精品视频一区二区三区八戒,亚洲一区色图,91专区,yellow网站在线观看

SHENZHOU MANUFACTURING GROUP

+86-315-2961888/+86-315-2965555

Linhuan Coal Preparation Plant of Huaibei Mining Group has an annual capacity of 16.0mt/a. It adopts the full heavy medium separation process and has six branches, five of which adopt Shenzhou dry coal preparation technology for pre discharging reject, which has achieved the effect of killing three birds with one stone. First, it reduces the processing burden of heavy medium cyclone; Second, it reduces the load of flotation and slime concentration and pressure filtration system; Third, the power consumption per ton of coal is 2.6kw · h, and the proportion of washing per ton of coal saves 4.29kw · H. The successful application of the project has demonstration significance and provides reference experience for the process design of similar coking coal preparation plants.


ITEM

yield Wt%

ASH Ad%

RAW COAL

100

76.79

CLEAN COAL

34.82

55.58

REJECT

65.18

88.12

LIN HUAN COAL PREPARATION PLANT OF HUAIBEI MINING GROUP

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE

泗水县| 陇西县| 郓城县| 文山县| 兴安县| 清流县| 武清区| 新乐市| 原平市| 桃源县| 红原县| 碌曲县| 高邑县| 托克逊县| 沅陵县| 璧山县| 巴青县| 西安市| 普宁市| 泸州市| 济源市| 绥棱县| 安西县| 齐河县| 鸡西市| 衡东县| 板桥市| 祁连县| 泊头市| 尤溪县| 武城县| 长沙市| 大姚县| 前郭尔| 伊通| 苗栗市| 江山市| 上饶县| 新邵县| 缙云县| 龙川县|